Laserfiche WebLink
Blue Mountain Energy, Inc. - Deserado Mine <br /> Quarterly Sediment Pond Inspection Report <br /> First Quarter 2015 <br /> Inspector: Scott Wanstedt-Environmental Engineer <br /> erational Status— <br /> -- _ -- -_ --- -—�--T ------ _. <br /> u — o <br /> Type of Approx Sediment Outflow H`O Samp. <br /> # Ponds Name Description Date H,0 Level/o Level /o Yes No Yes No Comments <br /> 1 Sed Ponds DP-1 D-Portal 3/31 80 20 X X <br /> 2 RP-1 Refuse Area 1 3/31 0 10 X X <br /> 3 RP-2/3 Refuse Area 2/3 3/31 4 15 X X <br /> 4 RP-4 Refuse Area 4 3/31 <1 20 — X X <br /> 5 RP-5 'Refuse Area 5A 3/31 0 20 1 X X <br /> 6 RR 1 Railroad Fill Slope Pond 1 3/31 0 t 5 X X <br /> 7 RRS Railroad Loadout Washdown Sump 3/31 0 5 X X <br /> 8 SS-1 Slot Storage Building Access Road Pond 3/31 0 15 X X <br /> 9 SS-2 Slot Storage Blding Emerg.Coal Storage Area Pond 3/31 — 0 6 X X <br /> 10 HSL-1 Halandras Sanitary Land Fill Pond 3/31 0 X X <br /> —; - _ <br /> 11 SDH-2U Down Hole Sump Upper Influent Pond inactive inactive 5 X X Shut off 2/96 due to mine sealing <br /> 12 SDH-2L Down Hole Sump Lower Effluent Pond inactive inactive j 5 j X X 'Shut off 2/96 due to mine sealing <br /> 13 SDH-3/5 Down Hole Sump Discharge 2 inactive I inactive — 10 X X 'Shut off 2/96 due to mine sealing <br /> 14 TS-1 Transfer Building 1 3/31 0 20 X X <br /> _ <br /> 15 TS-2 Transfer Building 2 3/31 0 20 X X <br /> — — -- <br /> 16 TS-2a Temp Coal Storage by Transfer 2 3/31 0 -5 X X <br /> BD-1 B-Dewatering Pond#1 3/31 95 8 X Outflow weekly <br /> 17 _ <br /> 18 —{ BD-2 B-Dewatering Pond#2 3/31 100 15 X X Outflow weekly <br /> 19 _+ BD-3 B-Dewatering Pond#3 3/31 95 0 X X Outflow weekly <br /> 20 BD-4 B-Dewatering Pond#4 3/31 98 0 X X Outflow weekly <br /> 21 BD-5 B-Dewatering Pond#5 3/31 98 0 X X Outflow weekly <br /> i 22 BD-6 B-Dewatering Pond#6 3/31 98 0 X X Outflow weekly <br /> 23 113113-7 B-Dewatering Pond#7 3/31 95 0 X X Periodic outflow pumping dependent <br /> j 24 BD LC B-Dewatering Last Chance Pond 3/31 5 0 X X No outflow since construction <br /> 25 Prot Pond PP-1 Prep Plant Process Pond 3/31 50 20 X X <br /> II _ _ <br /> - 26 PP-2 jPrep Plant Process Pond 3/31 75 45 X X <br /> 27 RW-1 Raw Water Lagoon @ White River 3/31 100 25 X X Freshwater storage pumped from river <br />