Laserfiche WebLink
�l RECEIVED <br />APP 3 0 2015 <br />plVlBiv`v <br />RECLAMATION, <br />o _ fly <br />Nu► aW <br />110(2) Annual Report <br />Page 2 of ? <br />Permittee Name: <br />Jean Marie Cowman <br />Permit Number: <br />M- 2013 -052 <br />Operation Name: <br />Anus Dei Lode Claim <br />County: <br />El Paso <br />Annual Fee Due: <br />$259.00 <br />Anniversary Date: <br />Aril 29, 2015 <br />Permit Acreage: <br />9.90 <br />Current Bond Amt: <br />$6,553.53 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). Q NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year YES �O <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES O <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). qPffg . % �� a eAe <br />Trta( cur'r�e41 disfurbance of if tta3(mv p• (. ,s �p�ox !S X3o' on �s0' 2. <br />8. Number of acres that were newly affected during the current report year, lgoq b� La" <br />9. Number of acres that were reclaimed during the current report year. , 1p/1'� • / awe <br />10. Estimated new acreage to be affected in the next report year. • �� <br />11. Estimated acre to be reclaimed in the ne t report ear. d 7� , i te--2c <br />(IF I*e de .` a s e rhausP 6 f e std of -!� season, 4.t�a <br />12. Total acres variostages of reclamation, since permitted mining activities began: oe�t� <br />Total acres <br />Total acres molt <br />Total acres <br />Total acres <br />backfilled: <br />'L • <br />seeded w/ ,�s <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />h,2^ ( bl-o dca <br />Fertilizer <br />Mulch <br />application <br />gffr6ia seen/ <br />application <br />�/� <br />application <br />method: <br />d j1 fai ; Qz <br />method: <br />` <br />method: <br />pile + sure �n ��� s oje <br />