My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-29_REVISION - C2010088
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010088
>
2015-04-29_REVISION - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:42 PM
Creation date
4/29/2015 12:44:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
Revision
Doc Date
4/29/2015
Doc Name
2nd Adequacy Review
From
DRMS
To
J.E. Stover & Associates, Inc
Type & Sequence
TR3
Email Name
ZTT
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />April 29, 2015 <br />Jim Stover <br />J.E. Stover & Associates <br />2352 N. 7" St. Ste B <br />Grand Junction, CO 81501 <br />Re: Fruita Loadout (Permit No. C- 2010 -088) <br />Technical Revision 3 (TR -3) <br />Second Adequacy Review <br />Dear Mr. Jim Stover: <br />The Colorado Division of Reclamation, Mining and Safety (Division) has received the McClane <br />Canyon Mining, LLC (MCM) response to the Division's preliminary adequacy question for <br />Technical Revision 3 of the Fruita Loadout. After reviewing MCM's responses, the Division has the <br />following comment: <br />1. After reviewing the construction costs for the proposed incremental bonding for each <br />construction activity, it appears to the Division that there have been cost amount input errors <br />in the provided cost breakdowns. After adding all the costs for each activity, the total sum of <br />the costs prior to indirect costs is low by the amount of $269.45. The difference most <br />notably comes from Task No. 3 and No. 21. The Division has attached a spreadsheet <br />outlining each task and cost differences. Please correct this difference in cost amount per <br />task number. <br />If you have questions or need additional information, please feel free to contact me. <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining.state.co.us <br />John W. Hickenlooper, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />o� coca <br />1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.