Laserfiche WebLink
Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.800 <br />(SSD -AC) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3531 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />716.09 LCY /hr <br />2864.36 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.479/LCY <br />Total job time: <br />Total job cost: <br />117.80 Hours <br />$161,451 <br />