Laserfiche WebLink
BLASTING MATERIALS QUANTITIES <br />HOURLY EQUIPMENT COST <br />ipti <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: Atlas Capco DM45/HP - 9.0" <br />-Drill Pad Preparation: Cat D10T - l0SU <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery -Bulk Truck: <br />-Cap Truck: <br />NA <br />NA <br />ANFO Bulk Delivery Truck <br />Cap Delivery Truck <br />Drilling Drill Pad Misc_ Drill Misc_ Expl. Explosives Delivery <br />Cost Breakdown: Eauimnent Preparation Support Support Bulk Truck Can Truck <br />QUANTITY <br />UNIT <br />Total Quantity of Stemming Required: <br />46.38 <br />cubic yards <br />Total Quantity of Explosives Required: <br />420,329 <br />pounds <br />Total Quantity of det. cord/fuse /wire Required: <br />49,010 <br />linear feet <br />Quantity of Blasting Caps per Blasthole: <br />2 <br />cap(s) <br />Total Quantity of Blasting Caps Required: <br />2,790 <br />caps <br />Quantity of Primers per Blasthole: <br />1 <br />primer(s) <br />Total Quantity of Primers Required: <br />1,395 <br />primers <br />Quantity of Delays per Blasthole: <br />3 <br />delay(s) <br />Total Quantity of Delays Required: <br />4,190 <br />delays <br />HOURLY EQUIPMENT COST <br />ipti <br />Shift basis: 1 per day <br />Drilling Equipment - Drill: Atlas Capco DM45/HP - 9.0" <br />-Drill Pad Preparation: Cat D10T - l0SU <br />Misc. Drill Support Equipment: <br />Misc. Explosives Support Equipment: <br />Explosives Delivery -Bulk Truck: <br />-Cap Truck: <br />NA <br />NA <br />ANFO Bulk Delivery Truck <br />Cap Delivery Truck <br />Drilling Drill Pad Misc_ Drill Misc_ Expl. Explosives Delivery <br />Cost Breakdown: Eauimnent Preparation Support Support Bulk Truck Can Truck <br />Total work team cost/hour: $716.79 <br />MATERIALS COST <br />Drilling <br />Dozer <br />Unit Cost <br />Quantity <br />MiscTruck <br />MiscTruck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost /hour: <br />$64.94 <br />$120.17 <br />NA <br />NA <br />$67.53 <br />$5.42 <br />Operating cost/hour: <br />$181.66 <br />$184.48 <br />NA <br />NA <br />$45.07 <br />$9.52 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$38.01 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Unit Subtotals: <br />$246.59 <br />$342.65 <br />$0.00 <br />$0.00 <br />$112.60 <br />$14.95 <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />$246.59 <br />$342.65 <br />$0.00 <br />$0.00 <br />$112.60 <br />$14.95 <br />Total work team cost/hour: $716.79 <br />MATERIALS COST <br />Total Materials Cost: $174,739.65 <br />Description <br />Unit <br />Unit Cost <br />Quantity <br />Total Cost <br />Bulk ANFO nom. density <br />Blasting Agent: <br />( 7,900- 15,000 fps) <br />Pound <br />$0.234 <br />420328.524 <br />$98,356.87 <br />Cast primer, 2.0 lb <br />(electric or non - electric <br />Primers or Boosters: <br />system) <br />Each <br />$7.226 <br />1395.000 <br />$10,080.27 <br />Non - electric cap, delay <br />Blasting Caps: <br />(non - electric systems) <br />Each <br />$3.489 <br />2790.000 <br />$9,734.31 <br />Det. Cord, fuse, or <br />Detaline Detacord, 2.4 <br />wire: <br />gr./ft. ( Detaline system) <br />Linear foot <br />$0.140 <br />49009.521 <br />$6,861.33 <br />MS connectors (non- <br />Delays: <br />electric systems) <br />Each <br />$4.914 <br />4190.000 <br />$20,589.66 <br />NO MISCELLANEOUS <br />MATERIALS <br />Miscellaneous: <br />REQUIRED <br />NA <br />$0.000 <br />0.000 <br />$0.00 <br />Drill bits: <br />Bit life = 1,750 <br />Linear feet <br />$2,454.00 <br />11.865 <br />$29,117.21 <br />Total Materials Cost: $174,739.65 <br />