Laserfiche WebLink
DRILLING AND EXPLOSIVES PREPARATION TIME <br />Total Drilling Length: 2,578 linear feet <br />Unadjusted Drilling Rate: 82.00 feet /hour <br />Drilling Time: 49.39 hours <br />Job Condition Corrections: <br />Site Altitude: <br />7,100 <br />feet <br />Altitude Adjustment: <br />0.95 <br />(DRMS est.) <br />Job Efficiency Factor: <br />0.67 <br />(CH. Exc. HB) <br />Adjusted Drilling Rate: <br />52.19 <br />feet/hour <br />Explosives Prep. Time: <br />50.24 <br />hours <br />JOB TIME AND COST <br />Total Job Time: 99.63 Hours <br />Unit cost: $3.470 per cu. yd. Total Job Cost: $56,872 <br />