Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.790 <br />(3 SHIFTS /DAY) <br />1.000 <br />(DOZ -OC) <br />1.426 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.929 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.7535 <br />Adjusted unit production: 720.20 LCY /hr <br />Adjusted fleet production: 2880.8 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.607 /LCY <br />Total job time: <br />Total job cost: <br />34.98 Hours <br />$61,152 <br />