My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-29_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2015-04-29_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:42 PM
Creation date
4/29/2015 8:05:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
4/29/2015
Doc Name
Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR7
Email Name
JLE
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(fpm) <br />Time <br />min <br />1 <br />936.00 <br />-10.00 <br />3.00 <br />-7.00 <br />1411 <br />0.873 <br />Haul Time: 0.873 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(fpm) <br />Time <br />min <br />1 <br />936.00 <br />10.00 <br />3.00 <br />13.00 <br />1467 <br />0.969 <br />Return Time: 0.969 minutes <br />Total Truck Cycle Time: 4.968 minutes <br />Loading Tool unit <br />Production 3,761.53 LCY/Hour Adjusted for job efficiency: 2,971.61 LCY/Hour <br />Truck Unit Production <br />1,458.27 LCY/Hour Adjusted for job efficiency: 1,152.04 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 4 Truck(s) <br />JOB TIME AND COST <br />Fleet size: 1 <br />Adjusted hourly truck team production: 4,608.14 LCY/Hour <br />Adjusted single truck/loader team production: 2,971.61 LCY/Hour <br />Adjusted multiple truck/loader team production: 2,971.61 LCY/Hour <br />Team(s) <br />Unit cost: $1.314 /LCY <br />Total job time: 91.82 Hours <br />Total job cost: $358,605 <br />
The URL can be used to link to this page
Your browser does not support the video tag.