My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-29_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2015-04-29_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:42 PM
Creation date
4/29/2015 8:05:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
4/29/2015
Doc Name
Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
PR7
Email Name
JLE
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK /LOADER TEAM WORK <br />Task description: K/Gd Pits Regrade (Truck/Trackhoe); Cross Section 40550ON <br />Site: Trapper Mine Permit Action: PR07 Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: DO1 State: Colorado <br />Date: 4/20/2015 County: Moffat <br />8:47:00 AM <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />ipti <br />Truck Loader Team - Truck: KOMATSU 830E <br />- Loader: CAT 6090 <br />Support Equipment -Load Area: Cat DI IR - I ISU <br />-Dump Area: Cat DI IR - I ISU <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br />Abbreviation: None <br />Filename: CO10 -DO1 <br />Shift basis: 3 per day <br />Cost Breakdown: Truck /Loader Team Sunnort Equipment Maintenance Equipment <br />Total work team cost/hour: $3,905.41 <br />MATERIAL OUANTITIES <br />Initial volume: 375,847 CCY Swell factor: 1.000 <br />Loose volume: 375,847 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 492,200 Pounds <br />Payload Capacity: 169.72 LCY <br />Truck <br />Shovel <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost /hour: <br />$58.64 <br />$0.00 <br />$173.50 <br />$173.50 <br />$68.86 <br />$63.48 <br />Operating cost/hour: <br />$314.42 <br />$941.08 <br />$308.78 <br />$308.78 <br />$45.83 <br />$7526 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$29.12 <br />$37.13 <br />$38.01 <br />$38.01 <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$402.18 <br />$97821 <br />$520.29 <br />$52029 <br />$139.16 <br />$138.74 <br />Number of Units: <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $2,586.93 <br />Support: $1,040.58 <br />Maint: $277.90 <br />Total work team cost/hour: $3,905.41 <br />MATERIAL OUANTITIES <br />Initial volume: 375,847 CCY Swell factor: 1.000 <br />Loose volume: 375,847 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 492,200 Pounds <br />Payload Capacity: 169.72 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.