Laserfiche WebLink
BULLDOZER WORK <br />Task description: D/E Pits Regrade; Cross Section 406000/405500 <br />Site: Trapper Mine Permit Action: PR07 Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: B03 <br />Date: 2/24/2014 <br />User: JLE <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat DIIR - IISU <br />850 <br />Semi - Universal <br />NA <br />3 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C010 -1303 <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,748.35 <br />MATERIAL QUANTITIES <br />Initial Volume: 98,683 <br />Swell factor: 1.000 <br />Loose volume: 98,683 LCY <br />Source of estimated volume: Appx. A Table A -42; DRMS Weighted AVG Push Dist. <br />& Slope <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient <br />Average site altitude: <br />-20% <br />335 feet <br />903.2 LCY /hr <br />Consolidated stockpile 1.0 <br />6,800 feet <br />Material weight: 2,475 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Utilization % <br />Ownership Cost /Hour: <br />$90.05 <br />NA <br />Operating Cost/flour: <br />$308.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.26 <br />NA <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,748.35 <br />MATERIAL QUANTITIES <br />Initial Volume: 98,683 <br />Swell factor: 1.000 <br />Loose volume: 98,683 LCY <br />Source of estimated volume: Appx. A Table A -42; DRMS Weighted AVG Push Dist. <br />& Slope <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient <br />Average site altitude: <br />-20% <br />335 feet <br />903.2 LCY /hr <br />Consolidated stockpile 1.0 <br />6,800 feet <br />Material weight: 2,475 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />