Laserfiche WebLink
BULLDOZER WORK <br />Task description: Ash Pit Regrade; Cross Section 6/7 <br />Site: Trapper Mine Permit Action: PR07 Permit/Job #: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: A06 State: Colorado <br />Date: 4/20/2015 County: Moffat <br />8:12:44 AM <br />User: JLE <br />Agency or organization name: <br />HOURLY EOL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat DIIR - 11SU <br />850 <br />Semi - Universal <br />NA <br />3 per day <br />(CRG) <br />DRMS <br />Abbreviation: None <br />Filename: C010 -A06 <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,748.35 <br />MATERIAL OUANTITIES <br />Initial Volume: 27,940 <br />Swell factor: 1.000 <br />Loose volume: 27,940 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient: -25% <br />Average site altitude: <br />Appx. A Table A -41; DRMS Weighted AVG Push Dist. <br />& Slope <br />Cat Handbook <br />170 feet <br />1,735.9 LCY /hr <br />Consolidated stockpile 1.0 <br />7.050 feet <br />Material weight: 2,475 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost /Hour: <br />$90.05 <br />NA <br />Operating Cost/flour: <br />$308.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.26 <br />NA <br />Total unit Cost/Hour: $437.09 <br />Total Fleet Cost/Hour: $1,748.35 <br />MATERIAL OUANTITIES <br />Initial Volume: 27,940 <br />Swell factor: 1.000 <br />Loose volume: 27,940 LCY <br />Source of estimated volume <br />Source of estimated swell <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description <br />Average push gradient: -25% <br />Average site altitude: <br />Appx. A Table A -41; DRMS Weighted AVG Push Dist. <br />& Slope <br />Cat Handbook <br />170 feet <br />1,735.9 LCY /hr <br />Consolidated stockpile 1.0 <br />7.050 feet <br />Material weight: 2,475 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />