My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-12_PERMIT FILE - C1981014 (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2015-03-12_PERMIT FILE - C1981014 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:14 PM
Creation date
4/28/2015 9:30:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
3/12/2015
Section_Exhibit Name
4.15 Revegetation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />• 4.15.8 REVEGETATION SUCCESS CRITERIA <br />EFCI will comply with all revegetation success standards as set forth in 4.15.8. <br />The parameters of cover, production, diversity, and shrub density for <br />revegetated mine and loadout areas will be measured and evaluated to <br />determ ine statistical equivalence with corresponding reference areas. Additional <br />information on revegetation success criteria and evaluation methods is <br />presented in Section 2.05.4, Reclamation Plan. <br />4.15.9 REVEGETATION SUCCESS CRITERIA: CROPLAND <br />As documented in Section 2.04.3, Site Description and Land Use Information, <br />there are no areas which are or have been utilized as cropland within either the <br />mine or loadout areas. Consequently, the provisions of this section are not <br />applicable to the Southfield operations. <br />4.15.10 REVEGETATION SUCCESS CRITERIA: PREVIOUSLY MINED <br />LANDS: AREAS TO BE DEVELOPED FOR INDUSTRIAL OR <br />RESIDENTIAL USE <br />EFCI believes that most of the mine facility area was disturbed by pre-law <br />mining, and that the previous mining was abandoned prior to development of <br />the Southfield Mine. The area was not reclaimed in compliance with currently <br />applicable regulations and was re-disturbed by Southfield's operations. Since <br />there is currently insufficient evidence available to EFCI to prove that the area <br />was abandoned prior to re-disturbance by existing operations, EFCI will comply <br />with revegetation success standards as set forth in 4.15.8. <br />EFCI submitted information to the Division, in November 1997, demonstrating <br />that pre-law mining existed, was not in use, and was not reclaimed within the <br />facilities area. EFCI may provide further evidence of the above conditions and, <br />upon approval of the Division, adopt revised revegetation standards in <br />accordance with Rule 4.15.10(1) to effectively control erosion. <br />4.15 - 5 Revised 02/16/01 <br />Technical Revision No. 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.