My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-24_GENERAL DOCUMENTS - C1981008 (2)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2015-04-24_GENERAL DOCUMENTS - C1981008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:34 PM
Creation date
4/28/2015 9:29:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
4/24/2015
Doc Name
Correction in March 2015 Inspection Report
From
DRMS
To
Slash M LLC
Permit Index Doc Type
General Correspondence
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 24, 2015 C- 1981- 008/New Horizon Mine BFB <br />Vegetative Cover; Timing: <br />The side -roll irrigation systems were being installed on the Morgan property. Both of the pivot irrigation <br />systems were in operation on the Morgan property. <br />Just east of the former culvert 110 drainage, there is an area next to the reclaimed haul road that is covered with <br />—1" rock (photo 10). The rock could hinder the reclamation success of the area. <br />SIGNS AND MARKERS — Rule 4.02: <br />The disturbance boundary markers were in place along ditch C9 (photo 3). <br />The permit boundary sign south of topsoil pile G needed to be re- attached to the fence. The sign was repaired <br />during the inspection. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />The west side of topsoil pile 4 had to be moved to accommodate the installation of the trench drain to <br />Pond 13. The soil was pushed up on top and to the eastern side of the pile. The ring ditch was being reinstalled. <br />Topsoil piles F and G were being used to reclaim the north east haul road. <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Photo 1 — Straw Waddle Installation Photo 2 — Pond I I Rodent Hole Repair <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.