Laserfiche WebLink
Monitoring of monuments A, G, H and I on the City of Florence waterline was <br />eliminated when the corresponding sections of the waterline were abandoned. In <br />addition, the survey monuments for the Thompson Ranch structures were <br />relocated in 2002 to accommodate a change in survey method to a GPS system. <br />Regular monitoring of the identified monuments and structures was discontinued <br />at the end of 2003. In order to confirm and document long -term surface <br />subsidence effects, EFCI will conduct two additional su . s after <br />2003. One survey of the remaining Florence Watertin ompsonich, nd <br />Newlin Creek monuments will be completed dur* g year 3 (2006) of t <br />reclamation liability period. The second and final su ey, during year 10 (2013) o <br />the reclamation liability period, will also include the hi solution grid. <br />surveys will be documented by subsidence monitoring reports, copies o which <br />will be submitted to the CDMG. <br />MR -59 2.05.6 -60a Revised - Dec 2012 <br />