My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-12_PERMIT FILE - C1981014A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2015-03-12_PERMIT FILE - C1981014A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 9:48:44 AM
Creation date
4/28/2015 8:41:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
3/12/2015
Section_Exhibit Name
2.05.3 Operation Plan -Permit Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Also, with the exception of those modifications noted above, no additional <br />modifications or additions were made during the fourth permit term, nor are any <br />planned for the remainder of the mine life. Major structures and facilities utilized <br />in conjunction with EFCI's mining, coal preparation, and related operations include <br />the following: <br />- Mine Portals <br />- Mine Fans <br />- Shop/Office/Warehouse Building <br />- Coal Preparation Plant <br />- Coal and Refuse Conveyors <br />- Coal Stockpiles <br />- Truck Scale <br />- Rotary Breaker <br />- Coal Refuse Permanent Stockpile <br />- Topsoil Stockpiles <br />- Mine Roads <br />- Ponds, Impoundments and Diversions <br />- Power Transmission Lines and Associated Facilities <br />- Guard House, Coal Laboratory, and Parking Areas <br />- Fuel Tanks <br />- Rock Dust Storage Bin <br />- Explosives Bunker <br />All of these structures and facilities were designed and constructed, and utilized <br />and maintained, to serve specific needs and minimize potential environmental <br />damage and safety hazards. Upon completion of all mining related operations, <br />physical structures will be salvaged or demolished except those approved for <br />permanent retention. Demolition debris will be placed in designated disposal sites, <br />covered, and the disposal areas reclaimed. Disturbed areas will be regraded, <br />ripped as necessary to alleviate compaction, topsoil will be replaced, and the areas <br />will be revegetated as described in Section 2.05.4, Reclamation Plan. <br />2.05.3-18 Revised 5/13/04 <br />Permit Rerrewal RN-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.