My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-23_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-04-23_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 2:26:30 PM
Creation date
4/23/2015 9:19:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
4/23/2015
Doc Name
1st Quarter 2015 Wastebank Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2015
Report Quarter_Month
1
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i i <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />Via Electronic Transmittal <br />April 22, 2015 <br />Jason Musick <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Coal Mine Waste Banks & Pond Quarterly Inspections <br />Compaction Tests & Instrumentation Monitoring <br />Permit C- 1996 -083 <br />Dear Mr. Musick: <br />Enclosed please find the referenced reports for the 1 st quarter of 2015. <br />In January, the decision was made to evaluate the necessity of monthly monitoring of <br />VWP -06 & 08 based on the first quarter results. VWP -06 increased by 0.2 psi, and <br />VWP -08 decreased by 0.2 psi. Since there was not a significant change at either VWP, <br />please determine if it is acceptable for Bowie Resources, LLC, to drop back to quarterly <br />monitoring of the piezometers at gob pile #2 for calendar year 2015. <br />Please call if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />cc: Alysha Hernandez (DRMS) <br />Wm. A. Bear, Jr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.