Laserfiche WebLink
Table 1A <br />® Ready Mixed Concrete Company - Bromley Lakes Site <br />Depletions and Replacements (January - December 2015) <br />Proposed SWSP Operations <br />(all values in acre -feet unless specified) <br />[ 1] Total surface area of exposed ground water in Bromley Lakes Cell 2 is conservatively projected to be 29.2 acres. <br />[2] Gross evaporation rate equals 44.5; inches (3.71 ft) per year, based upon NOAA Evaporation Atlas. Monthly distribution based upon SB -120 Guidelines. <br />[3] Effective precipitation rate equals 70% of total precipitation, based upon average precipitation at the Brighton weather station. <br />4 [4] Net evaporation rate equals [2] - [3]. <br />[5] Net evaporation equals exposed ground water area multiplied by the net evaporation rate, [1] x [4]/12. <br />[6] Production from Kenneth Mitchell Lake 1 which is a slurry wall lined pit. <br />[7] Aggregate wash water depletion equals 2% by weight for gravel mined within a slurry wall lined pit. The wash water is pumped from Cell 2. <br />[8] Total evaporation and gravel mining depletion equals [5] + [7]. <br />[9] Lagged site depletion equals the Bromley Lakes Cell 2 evaporation and gravel depletion in column [8] lagged over 12 months according to the Cell 2 lagging factors <br />given in the October 2014 SWSP request. <br />.B` <br />BA <br />o BISHOP- 11ROGOEM ASSOCIATES. INC. 2/17/2015 8A3AM JAK <br />Bromley Lakes Cell 2 <br />Exposed <br />Gross <br />Effective <br />Net <br />Net <br />Gravel <br />Aggregate <br />Total <br />Ground <br />Evaporation <br />Precipitation <br />Evaporation <br />Evaporation <br />Production <br />Wash <br />Evap and <br />Lagged <br />Water Area <br />Rate <br />Rate <br />Rate <br />Within Lined Pit <br />Water <br />Gravel <br />Depletion <br />(acres) <br />(inches) <br />(inches) <br />(inches) <br />(tons) <br />Depletion <br />Depletion <br />Month <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />Jan 2015 <br />29.2 <br />1.34 <br />0.4 <br />1.0 <br />2.4 <br />0 <br />0 <br />2.4 <br />3.0 <br />Feb <br />29.2 <br />1.56 <br />0.3 <br />1.3 <br />3.1 <br />80,000 <br />1.2 <br />4.2 <br />3.8 <br />Mar <br />29.2 <br />2.45 <br />0.8 <br />1.6 <br />3.9 <br />110,000 <br />1.6 <br />5.5 <br />4.8 <br />Apr <br />29.2 <br />4.01 <br />1.2 <br />2.8 <br />6.9 <br />140,000 <br />2.1 <br />8.9 <br />6.7 <br />May <br />29.2 <br />5.34 <br />1.6 <br />3.8 <br />9.2 <br />140,000 <br />2.1 <br />11.3 <br />8.8 <br />Jun <br />29.2 <br />6.46 <br />1.1 <br />5.3 <br />13.0 <br />140,000 <br />2.1 <br />15.0 <br />11.4 <br />Jul <br />29.2 <br />6.68 <br />1.1 <br />5.6 <br />13.6 <br />160,000 <br />2.4 <br />16.0 <br />13.2 <br />Aug <br />29.2 <br />6.01 <br />1.2 <br />4.8 <br />11.6 <br />160,000 <br />2.4 <br />13.9 <br />13.0 <br />Sep <br />29.2 <br />4.45 <br />0.9 <br />3.6 <br />8.6 <br />160,000 <br />2.4 <br />11.0 <br />11.6 <br />Oct <br />29.2 <br />3.12 <br />0.5 <br />2.6 <br />6.4 <br />140,000 <br />2.1 <br />8.4 <br />9.9 <br />Nov <br />29.2 <br />1.78 <br />0.6 <br />1.2 <br />2.8 <br />110,000 <br />1.6 <br />4.4 <br />7.3 <br />Dec 2015 <br />29.2 <br />1.34 <br />0.3 <br />1.1 <br />2.6 <br />80,000 <br />1.2 <br />3.8 <br />5.8 <br />Total <br />- <br />44.52 <br />10.0 <br />34.5 <br />84.0 <br />1,420,000 <br />20.9 <br />104.9 <br />99.4 <br />[ 1] Total surface area of exposed ground water in Bromley Lakes Cell 2 is conservatively projected to be 29.2 acres. <br />[2] Gross evaporation rate equals 44.5; inches (3.71 ft) per year, based upon NOAA Evaporation Atlas. Monthly distribution based upon SB -120 Guidelines. <br />[3] Effective precipitation rate equals 70% of total precipitation, based upon average precipitation at the Brighton weather station. <br />4 [4] Net evaporation rate equals [2] - [3]. <br />[5] Net evaporation equals exposed ground water area multiplied by the net evaporation rate, [1] x [4]/12. <br />[6] Production from Kenneth Mitchell Lake 1 which is a slurry wall lined pit. <br />[7] Aggregate wash water depletion equals 2% by weight for gravel mined within a slurry wall lined pit. The wash water is pumped from Cell 2. <br />[8] Total evaporation and gravel mining depletion equals [5] + [7]. <br />[9] Lagged site depletion equals the Bromley Lakes Cell 2 evaporation and gravel depletion in column [8] lagged over 12 months according to the Cell 2 lagging factors <br />given in the October 2014 SWSP request. <br />.B` <br />BA <br />o BISHOP- 11ROGOEM ASSOCIATES. INC. 2/17/2015 8A3AM JAK <br />