My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-21_REVISION - M2011009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011009
>
2015-04-21_REVISION - M2011009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:55 PM
Creation date
4/22/2015 10:19:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011009
IBM Index Class Name
REVISION
Doc Date
4/21/2015
Doc Name
Request for Technical Revision TR01
From
IGWT Mining Inc.
To
DRMS
Type & Sequence
TR1
Email Name
MAC
TAK
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />8�s 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 -3567 <br />� <br />—/-;P 95 REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 20 1 I - DO 9 Site Name:_ /-/,,c4-, T 1 R c e,r- <br />Cou (DRUS Use onl RECEIVED <br />62; Pcrmittec: _-F0 1n1T Tel In I n s ' �'�-, c, . <br />vAPR 21 2015 <br />Operator (If Other than Permittee): <br />ff DIVISION Ol: REWMATION <br />Permittee Representative: /2 w n j er • . L01) MININGAND SAF Y <br />Please provide a brief description of the proposed revision: %'e c�� „ �`cg / c. a L5 rc, <br />use 0(- k- ,MtGa 1 �or +he• fEolj �pergi�d^ <br />�o Se(Tlc ocJf 5U5 `D ended G I u� S• <br />As defined by the Minerals Rules, a Technical Revision ('TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). _ Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. if at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre - defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />1IOc, 111, 112 construction <br />materials, and 112 quarries $216 VVI <br />112 hard rock (not DMO) <br />11Od, 112d(l, 2 or 3) <br />C:S AF &.Repo <br />$1.75 F1 <br />$1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.