Laserfiche WebLink
RECEIVED <br />APR 2 0 2015 <br />DIVISIUra ::>r p� : LAMATION, <br />MINING �qLg <br />g 7 MAP _ W <br />112e Annual Report <br />Page 2 of 3 <br />Permittee Name. <br />-- <br />Robins Construction, LLLP <br />Permit Number: <br />M -1991 -133 <br />Operation Name: <br />Valdez Gravel Mine <br />County: <br />Conejos <br />Annual Fee Due <br />$791.00 <br />Anniversary Date: <br />it 20, 2015 <br />Permit Acreage- <br />125.00 <br />Current Bond Amt: <br />$24,407.62 <br />According to C.R.S. 34- 32.5 -116 or 34-32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected Land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If; while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 1 g0 days per year? <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for UfrERMTrIENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />S. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total urea in various stages of reclamation, since tted mining activities <br />YES J NO <br />0 NO <br />YES & <br />rr rlrre7 t <br />YES <br />YES <br />YES <br />NO <br />P <br />Z <br />Total acres <br />—C <br />- <br />Z <br />— <br />2- <br />w /topsoil <br />Total acres <br />Total acres 11 <br />Total acres <br />Total acres <br />baekfilied: <br />seeded w/ i O <br />w /topsoil <br />�,l <br />mulched w/ V <br />ved mix : <br />replaced: <br />roved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application i �/� <br />graded: <br />C7 <br />fertilized w/ <br />replacement <br />A)IA <br />rate (tons/ac): <br />apvd fertilizer <br />depth (in.): <br />Seed <br />Fertilizer Mulch <br />application <br />application i application <br />mod: <br />method: I method: <br />