My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-20_ENFORCEMENT - M2004031
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2004031
>
2015-04-20_ENFORCEMENT - M2004031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:25 PM
Creation date
4/20/2015 11:48:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
ENFORCEMENT
Doc Date
4/20/2015
Doc Name
Finding of Fact, Conclusions of Law and Order
From
DRMS
To
Aggregate Industries- WCR, Inc
Email Name
TOD
AJW
TAK
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
area. The Operator failecl to minimize the disturbance of ground water mounding to <br />the prevailing hydrologic balance in the surrounding area caused by the Operator's <br />actions, in violation of section 34- 32.5- 116(4)(h), C.R.S. <br />31. By violating section 34- 32.5- 116(4)(h), C.R.S., the Operator is in <br />violation of condition 1 of the permit, which requires the Operator to comply with <br />all applicable requirements of the Act. <br />32. Pursuant to section 34- 32.5- 124(7), C.R.S. the Board may impose a <br />civil penalty of not less than $100 per day nor more than $1,000 per day for each <br />day during which a permit violation occurs. The Board may impose a civil penalty <br />against the Operator based on one hundred forty -five (145) days of violation (from <br />the October 31, 2014 inspection to the March 25, 2015 Board meeting) at $100 to <br />$1,000 per day for a civil penalty of $14,500 to $145,000. <br />ORDER <br />Based _on the foregoing findings of fact and conclusions of law, the Board finds <br />the Operator in violation of section 34- 32.5- 116(4)(h),C.R.S. for failing to minimize <br />the disturbance to the prevailing hydrologic balance in the surrounding area. <br />The Board imposes the following CORRECTIVE ACTION against the Operator: <br />A. Submit a Temporary Groundwater Motnding Mitigation Plan <br />( "Temporary Plan ") to the Division within thirty (30) days of the effective <br />date of this Order. The Temporary Plan shall be submitted in an <br />approvable form as a Technical Revision. Implementation of that <br />Temporary Plan shall commence within five (5) days of Division's approval <br />of the Technical Revision. <br />B. Submit a Permanent Groundwater Mounding Mitigation Plan <br />("Permanent Plan ") to the Division no later than ninety (90) days after the <br />effective date of this Order. The Permanent Plan shall be submitted in an <br />approvable form, as either a Technical Revision or a� permit Amendment. <br />Implementation of that Permanent Plan shall commence within thirty (30) <br />days of Division approval. <br />The Board imposes a CI`TIL PENALTY for one hundred forty -five (145) days <br />of violation at seven hundred fifty dollars ($750) per day for a total civil penalty of <br />$108,750. All but $10,000 of the civil penalty is suspended if the Operator complies <br />with the corrective actions in the time specified. The portion of the civil penalty not <br />suspended, $10,000, shall be due and payable within thirty (30) days of the effective <br />Aggregate Industries — WCR, Inc. <br />M- 2004 -031 <br />MV -2015 -003 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.