Laserfiche WebLink
Table of Contents <br />EXECUTIVE SUMMARY <br />1 <br />1. INTRODUCTION <br />1 <br />1.1 Terms and Conditions <br />1 <br />1.2 Purpose and Scope of Work <br />1 <br />1.3 Project Description <br />1 <br />2. LAND DISTURBED IN 2014 <br />2 <br />3. RECLAMATION ACTIVITIES IN 2014 <br />3 <br />3.1 Constructed Wetlands Areas and Adjacent Slopes <br />3 <br />3.2 Tie Camp Creek Disposal Cell ' <br />5 <br />3.3 Drainage and Erosion Control in the North and South pits and Indian and Tie Camp Rock <br />' <br />Dumps <br />8 <br />4. MONITORING AND ANNUAL REPORTING <br />21 <br />4.1 Slope Movement Vector Analysis <br />21 <br />4.2 Inclinometer Evaluation <br />22 <br />4.3 Pinnacle Mine Workings Monitoring <br />23 <br />4.3.1 Spring and Seep Monitoring <br />23 <br />4.3.2 Groundwater Levels <br />24 <br />Pinnacle Adit Flow <br />25 <br />4.4 Sediment Control Embankment <br />25 <br />4.5 Waste Rock Dumps <br />26 <br />4.6 Water Quality Monitoring & Colorado Discharge Permit System <br />27 <br />4.7 Radioactive Materials License <br />I <br />29 <br />5. INSPECTIONS <br />30 <br />6. SURETY <br />32 <br />7. LAND OWNERSHIP <br />I <br />33 <br />8. MONITORING & RECLAMATION ACTIVITIES PLANNED <br />FOR 2015 <br />34 <br />r9. REFERENCES <br />36 <br />Tables <br />i <br />' <br />Table 1 Springs and Seeps Summary of Activity <br />(1995 -2014) <br />Figures <br />Figure 1 Site Location Map <br />Figure 2 2014 Reclamation Areas <br />Figure 3 Site Layout with Monitoring Stations <br />Figure 4 Water Level Elevation Data <br />Figure 5 Hydrograph of Pinnacle Adit Discharge <br />' <br />Figure 6 Pinnacle Adit Discharge <br />j <br />Figure 7 Land Ownership <br />1 <br />Pitch 2014 Reclamation Report 16April2015_CW. Docx <br />