Laserfiche WebLink
is valuable. The slab will be placed in the mill tunnel prior to sealing. All gas lines will be <br />excavated and will be disposed of in trash. The reclamation colts reflect these additional costs <br />for this work. <br />Item 11 — Avalanche Berm <br />The avalanche berm is a 35 feet high berm constructed immediately west of the Office/Dry <br />Building to ensure that avalanches do not damage this structure and other nearby structures. The <br />berm is constructed out of blasted waste rock with high angularity that can withstand a steeper <br />{ <br />angle. This steeper angle of 1.42H:1 V, is important for the deflection of the avalanches and will <br />be stable from the standpoint of slope stability. Revised Maps IC -2, C -3 and C -4 show the berm <br />and its contours. <br />This plan has been withdrawn from the Technical Revision. <br />and Atlas /Cumberland will be allowed to come out the portal <br />the mill process, which is a closed water system. Water <br />may stay in the Virginius workings. <br />water from Yellow Rose Drift <br />a portion may be used in <br />in the Virginius workings <br />