My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-16_REVISION - M2012032 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2015-04-16_REVISION - M2012032 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:39 PM
Creation date
4/17/2015 3:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
4/16/2015
Doc Name
TR05 Submittal for Modification
From
Fortune Revenue Silver Mines, inc
To
DRMS
Type & Sequence
TR5
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7). Sodium Hydroxide (Caustic) — (1) 250 gal. Tote Minimum, `1 'h tote Maximum. <br />8). Sulfuric Acid — (1) 55 gal. Drum on site Minimum, 1 '/2 dru I s Maximum. <br />9). Perlite filtration additive — (20) 30 lb bags Minimum, (40) 30 ID bags Maximum. <br />10).Quick Lime (Non- Hydrated) (20) 50 lb bags Minimum, (48) 50 ID bags Maximum. <br />11).Orfom D8 — (1) 5 gal. Drum Minimum, (1) 55 gal. Drum Maximum. <br />The maximum amount of chemicals to be stored on site at any f one time should be the amounts <br />listed above. These totals would be 6 — 55 gal drums, 260 — 50 lb (and 30 lb) bags, and 1 -1/2 <br />totes of 240 gallons each for the Sodium Hydroxide. <br />All of the reagents are stored in the reagent room located on the East side of the Mill building <br />except hydrated lime, which may be stored at various places inside the mine and the mill, and <br />Dry Lime/Perlite, which may be stored at any of the following possible locations: <br />Outside storage tent/Conex <br />Coarse Ore Bin area underground <br />CV -05 conveyor belt underground <br />(Bulk) Stored in the main entry to the mill underground <br />Crusher Gallery underground <br />Tailings Press Area in Filter Building on surface <br />All chemical MSDS sheets for the chemicals above have been included in the modified <br />Appendix 5, which was included as part of Technical Revision 5. <br />1 <br />The reagent room in the filter building is protected from spills by an epoxied concrete surface <br />with a 4 -6" vertical epoxied wall around the floor of the entire room, which is capable of <br />handling the rupture of all chemical tanks stored in the room,. <br />All chemical MSDS sheets for the chemicals above have been included in the modified <br />Appendix 5, <br />
The URL can be used to link to this page
Your browser does not support the video tag.