Laserfiche WebLink
CONSTRUCTION ACTIVITY NO. 3 <br />Reclamation <br />Activity <br />Install Rail and Construct Bridge <br />048 <br />Remove Fill from Reed Wash Bridge Area to Facilities Area <br />$ 11,462.00 <br />049 <br />Reconstruct Reed Wash at Rail Bride <br />$ 42,013.54 <br />061 <br />H droseed Reconstructed Reed Wash Bridge Area <br />$ 6,254.00 <br />065 <br />Demolish and Remove All Structures <br />Rail Road Track <br />$ 97,890.95 <br />Ballast <br />$ 10,742.18 <br />Remove Bridge over Reed Wash <br />$ 65,667.53 <br />Subtotal Construction Activity #3 Direct Costs <br />$ 234,030.19 <br />INDIRECT COSTS <br />Liability Insurance 2.02% <br />$ 4,727.41 <br />Performance Bond 1.05% <br />$ 2,457.32 <br />Job Superintendent 136.01 <br />$ 10,222.51 <br />Profit 10% <br />$ 23,403.02 <br />Contract Amount Direct + O & P <br />$ 274,840.44 <br />Legal - Engineering - Project Management <br />Financial Warrant <br />$ - <br />Engineering work and /or contract bid preparation 6% <br />$ 16,490.43 <br />Reclamation management and /or administration 4.5% <br />$ 12,367.82 <br />Contingency <br />$ - <br />Total Indirect Costs <br />$ 28,858.25 <br />Construction Activity #3 Total Bond Amount direct + indirect <br />$ 303,698.69 <br />TR -03 3.02 -62 04/15 <br />