My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-14_REPORT - P2010007
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2010007
>
2015-04-14_REPORT - P2010007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 9:48:07 AM
Creation date
4/17/2015 8:48:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010007
IBM Index Class Name
REPORT
Doc Date
4/14/2015
From
Rio Grande Silver, Inc
To
DRMS
Annual Report Year
2015
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 4 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: i <br />14. <br />15. <br />16. <br />17. <br />18. <br />If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plann )? YES NO N/A <br />Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br />Does your NOI reclamation plan or Environmental Protection Plan require yL to submit monitoring information <br />annually? I YES NO N/A <br />If "Yes ", please attach the required monitoring results to this Annual Report, as required by Rule 1.15(1)(c). <br />As required by Rule 5.6(1)(g) submit with this report documentation to show1 that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbari`ce(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: VPC <br />i <br />Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />No exploration work was conducted under this NOI in 2014. <br />
The URL can be used to link to this page
Your browser does not support the video tag.