Laserfiche WebLink
Page 3 of 4 <br />13. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO N/A <br />If "NO" please explain: i <br />14. <br />15. <br />16. <br />17. <br />18. <br />If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />State Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plann )? YES NO N/A <br />Are all hazardous materials stored within approved spill containment structures? YES NO N/A <br />Does your NOI reclamation plan or Environmental Protection Plan require yL to submit monitoring information <br />annually? I YES NO N/A <br />If "Yes ", please attach the required monitoring results to this Annual Report, as required by Rule 1.15(1)(c). <br />As required by Rule 5.6(1)(g) submit with this report documentation to show1 that the Financial Warranty is still in <br />place and is adequate to fully reclaim the approved prospecting site disturbari`ce(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: VPC <br />i <br />Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred during <br />the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock dumps, <br />adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to safeguard <br />shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional pages <br />should be attached if needed. <br />No exploration work was conducted under this NOI in 2014. <br />