My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-09_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2015-02-09_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:20 PM
Creation date
4/16/2015 1:22:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
2/9/2015
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Illustration 47
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Regrad <br />Site: Deserado Mine <br />BULLDOZER WORK <br />D -Portal Area <br />Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 7/16/2014 County: Rio Blanco <br />User: JRS <br />Agency or organization name: DRMS <br />Page 1 of 2 <br />Permit/Job #: C1981018 <br />Abbreviation: None <br />Filename: 002 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$81.10 <br />NA <br />Operating Cost/Hour: <br />$143.16 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $262.26 <br />Total Fleet Cost/Hour: $1,049.04 <br />MATERIAL QUANTITIES <br />Initial Volume: 160,750 <br />Swell factor: 1.111 <br />Loose volume: 178,593 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />250 feet <br />546.0 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,300 feet <br />2,743 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.