Laserfiche WebLink
I <br />1 <br />Truck/Loader Worksheet Cont'd Task # 001 Page 3 of 3 <br />i <br />Hanl Rnnte <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />N <br />( %) <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />231.58 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />3600.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.379 <br />Haul Time: 1.379 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />N <br />N <br />(fpm) <br />Time <br />LCY/Hour Adjusted for job efficiency: <br />231.58 LCY/Hour <br />Truck Unit Production <br />min <br />1 <br />3600.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />1.281 <br />t <br />, <br />CIRCES Cost Estimating Software <br />Return Time: 1.281 <br />minutes <br />Total Truck Cycle Time: 5.161 <br />minutes <br />Loading Tool unit <br />Production <br />279.01 <br />LCY/Hour Adjusted for job efficiency: <br />231.58 LCY/Hour <br />Truck Unit Production <br />91.96 <br />LCY/Hour Adjusted for job efficiency: <br />76.33 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 228.98 <br />LCY /Hour <br />Adjusted single truck/loader team production: 228.98 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 228.98 <br />LCY /Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 20.35 <br />Hours <br />Unit cost: <br />$3.399 <br />/LCY Total job cost: $15,840 <br />, <br />t <br />, <br />CIRCES Cost Estimating Software <br />