Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 075 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: 1 GRAND JUNCTION <br />Total one -way travel distance: j 25.00 miles <br />Average Travel Speed: 1 50.00 mph <br />Total Non - Roadable Mob/Demob Cost * f <br />`* two round trips with haul rig: $4,564.61 <br />Total Roadable Mob/Demob Cost ** $466.70 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />0.50 <br />NA <br />0.50 <br />NA <br />2.00 <br />1.00 <br />Total job time: f 4.00 Hours <br />Total job cost: $5,031 <br />i <br />CIRCES Cost Estimating Software <br />