Laserfiche WebLink
v <br />BULLDOZER WORK <br />Page 1 of 2 <br />Task description: Regrade Pond 2 . ' <br />Site: Fruita Loadout Permit Action: MT i t <br />Permit/Job #: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 046 State: Colorado <br />Date: 8/26/2014 County: Mesa <br />User: ZTT <br />Agency or organization name: DRMS <br />Abbreviation: None <br />Filename: C088 -046 <br />HOURLY EQUIPMENT COST <br />I <br />Basic Machine: Cat D9T - 9SU <br />i <br />Horsepower: 405 <br />i <br />Blade Type: Semi - Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization <br />Ownership Cost/Hour: <br />$81.29 <br />NA <br />Operating Cost/Hour: <br />$142.41 <br />100 <br />Ripper op. Cost/Hour: <br />$5.18 <br />50 <br />Operator Cost/Hour: <br />$38.85 <br />NA i <br />Total unit Cost/Hour: $267.73 <br />Total Fleet Cost/Hour: $267.73 <br />MATERIAL QUANTITIES <br />Initial Volume: 10,000 <br />Swell factor: 1.165 <br />Loose volume: 11,650 LCY <br />Source of estimated volume: Operator Estimate; Map 13 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 1,243.2 LCY /hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 0% i <br />Average site altitude: 4,500 feet <br />Material weight: 2,900 lbs/LCY i <br />Weight description: Decomposed rock - 50% Rock, 50% Earth 1 <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG. <br />Material consistency: 0.900 CAT HB <br />Dozing method: 1.000 GEN. <br />1 <br />CIRCES Cost Estimating Software <br />