Laserfiche WebLink
i <br />I <br />+ Page 1 of 2 <br />1 <br />BULLDOZER WORK <br />! <br />Task description: Regrade Light -Use Road #2 + <br />Site: Fruita Loadout Permit Action: MTI I Permit/Job #: C2010088 <br />PROJECT IDENTIFICATIO N <br />Task #: 033 <br />Date: 8/26/2014 <br />User: ZTT <br />! <br />State: Colorado i <br />County: Mesa <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 { <br />Blade Type: Semi - Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Abbreviation: None <br />Filename: C088 -033 <br />MATERIAL QUANTITIES ! <br />Initial Volume: 1,100 <br />Swell factor: 1.165 <br />Loose volume: 1,282 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />0% <br />150 feet <br />910.5 LCY/hr <br />Compacted fill or embankment 0.9 <br />4,500 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG. <br />Material consistency: 0.900 CAT HB <br />Dozing method: 1.000 GEN. <br />I <br />CIRCES Cost Estimating Software <br />Cost Breakdown: <br />! <br />4 <br />Utilization % <br />Ownership Cost/Hour: <br />$81.29 <br />NA <br />Operating Cost/Hour: <br />$142.41 <br />100 + <br />Ripper op. Cost/Hour: <br />$5.18 <br />50 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total unit Cost/Hour: <br />$267.73 <br />! <br />Total Fleet Cost/Hour: <br />$267.73 <br />i <br />MATERIAL QUANTITIES ! <br />Initial Volume: 1,100 <br />Swell factor: 1.165 <br />Loose volume: 1,282 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety; Map 15 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />0% <br />150 feet <br />910.5 LCY/hr <br />Compacted fill or embankment 0.9 <br />4,500 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG. <br />Material consistency: 0.900 CAT HB <br />Dozing method: 1.000 GEN. <br />I <br />CIRCES Cost Estimating Software <br />