Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 003 Page 3 of 3 <br />Nan] Rnute- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />( %) <br />M <br />(fpm) <br />I <br />Time <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.635 <br />Haul Time: 0.635 minutes <br />Return Route: <br />r <br />r <br />i <br />1 <br />CIRCES Cost Estimating Software <br />I <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />N <br />( %) <br />(fpm) <br />Time <br />128.76 <br />LCY/Hour Adjusted for job efficiency: <br />106.87 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />1 1500.00 0.00 3.00 3.00 2874 0.550 <br />r <br />r <br />i <br />1 <br />CIRCES Cost Estimating Software <br />I <br />Return Time: 0.550 <br />minutes <br />Total Truck Cycle Time: r 3.686 <br />minutes <br />Loading Tool unit <br />Production <br />279.01 <br />LCY/Hour Adjusted for job efficiency: <br />231.58 LCY/Hour <br />Truck Unit Production <br />128.76 <br />LCY/Hour Adjusted for job efficiency: <br />106.87 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 320.61 <br />LCY/Hour <br />Adjusted single truck/loader team production: 231.58 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 231.58 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 257.07 <br />Hours <br />Unit cost: <br />$3.361 <br />/LCY Total job cost: $200,080 <br />r <br />r <br />i <br />1 <br />CIRCES Cost Estimating Software <br />I <br />