My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-11_PERMIT FILE - C1981038A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2015-03-11_PERMIT FILE - C1981038A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 9:45:51 AM
Creation date
4/15/2015 1:28:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
3/11/2015
Section_Exhibit Name
VOLUME 8A - NPDES Permit
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OFPUBLICHEALTHAND ENVIRONMENT, Water Quality Control Division <br />Rationale, Page 4, COG-0850000 Coal Mining General Permit <br />• Table III-2c: Alternate Effluent Limitations and Monitoring Requirements -Alkaline Drainage, Coal Preparation Plants and <br />Coal Preparation Plant Associated Areas and Western Alkaline Coal Mining (additional requirements apply to <br />Western Coal Mining, See Section III.A.3 of this rationale) <br />Limitations <br />Parameter 30-Day 7-Day Daily Rationale Monitoring Sample <br />Avg. Avg. Max. Frequency Type <br />--------------------------------------Federal Effluent Limitation Guidelines-------------------------------------- <br />Total Suspended Solids, mg/1 Report NA Report Federal ELG Weekly Grab <br />Totallron, mg/l <br />Existing Sources (before 5/4/84) Report NA Report Federal ELG Weekly Grab <br />New Sources (after 5/4/84) Report NA Report <br />Settleable Solids ml/l Report NA Report Federal ELG Weekly Grab <br />3. Effluent Limitations -Western Alkaline Coal Mining - In addition to the requirements under Part LB.1 above, western <br />alkaline coal mines are subject to 40 CFR Part 434 Subpart H. This subpart applies to alkaline mine drainage at western <br />coal mining operations from reclamation areas, brushing and grubbing areas, topsoil stockpiling areas, and regraded areas, <br />where the discharge, before any treatment has a pH equal to or greater than 6.0; has a dissolved iron concentration less <br />than 10 mg/L; and has a net alkalinity that is greater than zero. The effluent limitations in this subpart apply zrntil the <br />appropriate authority has authorized bond release. <br />a. Sediment Control Plan -The following items apply to those facilities, and specifically those areas outlined above. <br />1. The operator must submit asite-specific Sediment Control Plan to the permitting authority that is designed to <br />prevent an increase in the average annual sediment yield from pre-mined, undisturbed conditions. The Sediment <br />Control Plan must be approved by the permitting authority and be incorporated into the permit as an effluent <br />limitation. The Sediment Control Plan must identify best management practices (BMPs) and also must describe <br />• design specifications, construction specifications, maintenance schedules, criteria for inspection, as well as <br />expected performance and longevity of the best management practices. <br />2. Using watershed models, the operator must demonstrate that implementation of the Sediment Control Plan will <br />result in average annual sediment yields that will not be greater than the sediment yield levels from pre-mined, <br />undisturbed conditions. The operator must use the same watershed model that was, or will be, used to acquire the <br />SMCRA permit. <br />3. The operator must design, implement, and maintain BMPs in the manner specified in the Sediment Control Plan. <br />b. De znitions -The following definitions are specific to this subpart. <br />1. Brushing and grubbing area means the area where woody plant materials that would interfere with soil salvage <br />operations have been removed or incorporated into the soil that is being salvaged. <br />2. R~aded area means the surface area of a coal mine that has been returned to required contour. <br />3. Topsoil stockpilin area means the area outside the mined-out area where topsoil is temporarily stored for use in <br />reclamation, including containment berms. <br />4. Reclamation area means an area that was previously disturbed as a part of the coal mining operation that is being <br />reclaimed. <br />4. E flluent Limitations -Post Minin$ Areas and Reclamation Areas -Post-mining limitations may apply to outfalls serving <br />reclamation areas, which have been returned to the required contour and on which revegetation (seeding or plantings work <br />has commenced. Limitations may also apply to post mining underground mine areas. The permtttee may request <br />consideration for change from active mining limitations to post-mining limitations when these conditions have been met. <br />a. Post Mining Reclamation Areas -Tables III-3a and III-b apply to this category, subject to 40 CFR Part 434 Subpart <br />. E (Post Mining Areas). The following limitations apply to reclamation areas. The federal ELG limitations would apply <br />until bond release. If these wastewaters are combined with other waters under Section III of this rationale, then those <br />limitations shall apply. If this wastewater is combined with post mining underground mine wastewater, then the <br />limitations in Section IILD.2 apply to the combined discharge. If this post mining wastewater is separate, then the <br />following limitations apply. <br />
The URL can be used to link to this page
Your browser does not support the video tag.