My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-11_PERMIT FILE - C1981038A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2015-03-11_PERMIT FILE - C1981038A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 9:45:51 AM
Creation date
4/15/2015 1:28:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
3/11/2015
Section_Exhibit Name
VOLUME 8A - NPDES Permit
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART R <br />Page No. 23 <br />Permit No. COG-8500(10 <br />iii. Five (5) times the maximum concentration value reported for that pollutant in the permit application in accordance <br />with Section 61.4(2)(g). <br />iv. The level established by the Division in accordance with 40 CFR' 122.44(f). <br />b. That any activity has occurred or will occur which would result in any discharge, on anon-routine or infrequent basis, <br />of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following <br />"notification levels": <br />i. Five hundred micrograms per liter (500 ug/1); <br />ii. One milligram per liter (1 mg/1) for antimony; and <br />iii. Ten (10) times the maximum concentration value reported for that pollutant in the permit application. <br />iv. The level established by the Division in accordance with 40 CFR' 122.44(f). <br />6. Bypass Notification <br />If the permittee knows in advance of the need for a bypass, a notice shall be submitted, at least ten days before the date of <br />the bypass, to the Division. The bypass shall be subject to Division approval and limitations imposed by the Division. <br />Violations of requirements imposed by the Division will constitute a violation of this permit. <br />7. Upsets <br />a. Effect of an Upset. <br />An upset constitutes an affirmative defense to an action brought for noncompliance with permit effluent limitations if <br />the requirements of paragraph (b) of this section are met. No determination made during administrative review of <br />claims that noncompliance was caused by upset, and before an action for noncompliance, is final administrative action <br />subject to judicial review. <br />b. Conditions Necessary for a Demonstration of Upset <br />A permittee who wishes to establish the affirmative defense of upset shall demonstrate through properly signed <br />contemporaneous operating logs, or other relevant evidence that: <br />i. An upset occurred and that the permittee can identify the specific cause(s) of the upset; and <br />ii. The permitted facility was at the time being properly operated and maintained; and <br />iii. The permittee submitted proper notice of the upset as required in Part II.A.4. of this permit (24-hour notice); and <br />iv. The permittee complied with any remedial measure necessary to minimize or prevent any discharge or sludge use <br />or disposal in violation of this permit, which has a reason able likelihood of adversely affecting human health or <br />the environment. <br />In addition to the demonstration required above, a permittee who wishes to establish the affirmative defense of upset <br />for a violation of effluent limitations based upon water quality standards shall also demonstrate through monitoring, <br />modeling or other methods that the relevant standards were achieved in the receiving water. <br />c. Burden of Proof <br />In any enforcement proceeding, the permittee seeking to establish the occurrence of an upset has the burden of proof. <br />8. Discharge Point <br />Any discharge to the waters of the State from a point source other than specifically authorized by this permit is prohibited. <br />9. Proper Operation and Maintenance <br />The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and <br />related appurtenances) which are installed or used by the permittee as necessary to achieve compliance with the conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.