Laserfiche WebLink
Mr. Murray <br />Page 4 <br />April 14, 2015 <br />6.4.6 Exhibit F — Reclamation Plan Map <br />No comment. <br />6.4.7 Exhibit G — Water Information <br />No comment. <br />6.4.8 Exhibit H — Wildlife Information <br />No comment. <br />6.4.9 Exhibit I — Soils Information <br />No comment. <br />6.4.10 Exhibit J — Vegetation Information <br />No comment. <br />6.4.11 Exhibit K — Climate <br />No comment. <br />6.4.12 Exhibit L — Reclamation Costs <br />14. The proposed reclamation costs for the gold operation are based on three cuts or phases in the <br />following conditions: active mining, active reclamation and active stripping. The proposed <br />bonding structure assumes that once a phase has been completely reclaimed, then the <br />financial warranty associated with that particular phase may be applied to another <br />undisturbed phase. The bonding structure does not account for any remaining costs <br />associated with the potential failure of vegetation for each of the reclaimed phases. Please <br />indicate how the Operator intends to bond for this liability until such time as a reclaimed area <br />has been released from further reclamation responsibility. <br />15. The Division will calculate the required financial warranty amount once all of the adequacy <br />issues have been addressed. <br />6.4.13 Exhibit M — Other Permits and Licenses <br />No comment. <br />