My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-14_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2015-04-14_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:46:00 PM
Creation date
4/15/2015 8:51:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
REVISION
Doc Date
4/14/2015
Doc Name
Adequacy Review No. 1
From
DRMS
To
High Mountain Mining Co., LLC
Type & Sequence
AM5
Email Name
MAC
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Murray <br />Page 4 <br />April 14, 2015 <br />6.4.6 Exhibit F — Reclamation Plan Map <br />No comment. <br />6.4.7 Exhibit G — Water Information <br />No comment. <br />6.4.8 Exhibit H — Wildlife Information <br />No comment. <br />6.4.9 Exhibit I — Soils Information <br />No comment. <br />6.4.10 Exhibit J — Vegetation Information <br />No comment. <br />6.4.11 Exhibit K — Climate <br />No comment. <br />6.4.12 Exhibit L — Reclamation Costs <br />14. The proposed reclamation costs for the gold operation are based on three cuts or phases in the <br />following conditions: active mining, active reclamation and active stripping. The proposed <br />bonding structure assumes that once a phase has been completely reclaimed, then the <br />financial warranty associated with that particular phase may be applied to another <br />undisturbed phase. The bonding structure does not account for any remaining costs <br />associated with the potential failure of vegetation for each of the reclaimed phases. Please <br />indicate how the Operator intends to bond for this liability until such time as a reclaimed area <br />has been released from further reclamation responsibility. <br />15. The Division will calculate the required financial warranty amount once all of the adequacy <br />issues have been addressed. <br />6.4.13 Exhibit M — Other Permits and Licenses <br />No comment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.