EXHIBIT D <br />Reclamation Plan <br />Upon completion of the excavation, all areas will be leveled and re- graded to <br />form a 3:1 slope that blends in with the undisturbed adjacent ground. <br />Additional imported topsoil material will be required to provide quantities <br />sufficient to allow for adequate revegetation of the site. <br />Three to four inches of topsoil will be used to cover the entire reclaimed area. <br />Supplementing the plant growth medium with 10 -20 tons per acre of organic <br />matter (manure) will be part of the reclamation process. <br />1 <br />As needed, all packed areas will be ripped and disked prior to revegetation. <br />Measures taken to re- vegetate the site will be in accordance with reclamation <br />plan recommended by Natural Resource Conservation Service. Refer to <br />attached N.R.C.S. sheet. <br />