Laserfiche WebLink
Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2014 Annual Hydrology Report <br />parameters required on springs with flows greater than five (5) gallons per minute. <br />During the construction phase of the mine, four (4) springs (S-6, S-7, S-9 and S-15) <br />were eliminated by road and portal bench construction activities. The 2014 field and <br />laboratory analysis are consistent with baseline data provided in the permit application. <br />There has been a trend in many of the springs that shows the conductivity increases as <br />the flow decreases. This trend is most likely caused by the increased time the water is <br />in contact with the alluvium because of the lower flows. <br />Surface Water Monitoring Stations: STREAMS AND DITCHES <br />Forty-one surface water monitoring stations including the North Fork of the Gunnison, <br />Terror Creek, Hubbard Creek, Freeman Gulch, the Deer Trail Ditch, Stephens Draw, the <br />Fire Mountain Canal and Gulches A through D are monitored quarterly for field <br />parameters and semi-annually for full suite analysis. The results of the 2014 field and <br />laboratory studies are consistent with baseline information supplied in the permit <br />application. <br />The USGS, with right of way permission from the USDA-Forest Service, installed <br />continuous monitoring stations on both Hubbard and Terror Creeks. Similar stations are <br />installed near each creek's confluence with the North Fork of the Gunnison River. <br />These stations have been calibrated by the USGS's hydrology department and now <br />provide accurate readings for the Annual Hydrology Reports. The USGS did not collect <br />flow data for any of their stations during 2014. <br />Surface Water Monitoring Stations: SMALL AREA EXEMPTIONS <br />The locations of the small area exemptions are presented on Map 20. The Applicant <br />will monitor the flow from the small area exemptions to assure compliance with <br />4.05.2(3). The Applicant will use its best efforts to obtain samples. The samples will be <br />analyzed for pH, conductivity and total settleable solids. Samples will be in compliance <br />if they contain settleable solid levels of 0.5 ml/l or less and the pH is greater than 6.5 <br />and less than 9.0. No small area exemption sampling was performed during the year. <br />Coal Member of Mesaverde <br />Fifteen bedrock wells were monitored during the 2014 sampling season. These holes <br />were monitored quarterly for field parameters and semi-annually for full suite laboratory <br />analysis. Data collected and evaluated is consistent with the baseline information <br />provided in the permit application. The mine construction work during 1997 required the <br />elimination of four monitored drill holes. These holes are DH 42, DH 52, DH 54 and DH <br />55 and were located near the mine portals. Drill Holes DH-13 and DH-34b were <br />eliminated by mining. Drill hole DH-34c was damaged by ground movement. DH-16 is <br />5 <br />