Laserfiche WebLink
Bowie Resources, LLC <br />Surface Water <br />Bowie No. 2 Mine <br />SP5-1 <br />2014 Annual Hydrology Report <br />Terror Creek - Pond Spring 5-1 <br />Elevation - 7400 <br />Initiated7/18/19857/18/19857/18/19857/18/1985 <br />Activated <br />Date10/10/20148/12/20146/25/20144/19/2014 <br />Summary Information <br />Field BaselineOperation <br />ParametersUNITSMinAveMaxMinAveMax <br />OutflowGPM0.000.947.361.50 <br />InflowGPM0.000.000.00SeepSeepSeepSeep <br />FreeboardFeet0.000.000.000.00 <br />TemperatureCelsius4.112.823.25.5 <br />Conductivityumhos/cm490672804680 <br />pHsu7.38.29.08.0 <br />Field Comments Pond Filled In <br />Lab <br />ParametersUNITS <br />Bicarbonatemg/L256.0383.5441.6 <br />Carbonatemg/L161616 <br />Chloridemg/L2.06.410 <br />Conductivityumhos/cm552656.85974 <br />Hardnessmg/L182250.75287 <br />Aciditymg/L14.014.014 <br />pHsu6.47.898.7 <br />ResidueFilterable-TDSmg/L320374.92451 <br />ResidueNonFilterable-TSSmg/L2128742 <br />SAR1.221.692.5 <br />Sulfatemg/L1634.2570 <br />Calcium (Dissolved)mg/L30.057.869.0 <br />Magnesium (Total)mg/L18.025.928.0 <br />Sodium (Dissolved)mg/L43.061.076.0 <br />Iron (Total)mg/L0.390.390.39 <br />Iron (Dissolved)mg/L0.060.060.06 <br />Manganese (Total)mg/L0.060.060.06 <br />TDS Ratio (grav./calc.) <br />The area of concern for monitoring point SP5-1 has not been affected by the mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />Baseline Information Collection initiated on 7/18/85 and not yet considered complete. <br />Point SP5-1 has not been influenced by mining. <br />Figure No. 1 <br />