My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-08_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2015-04-08_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:08 PM
Creation date
4/9/2015 7:09:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/8/2015
Doc Name
Letter & Application
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
TR105
Email Name
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A�'pp CO <br />He <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right comer of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 019 Date: 4 / 07 / 15 <br />Permittee: Colowyo Coal Company, L.P. <br />Street: 5731 State Highway 13 <br />City: <br />State: <br />Meeker <br />CO Zip Code: 81641 _ <br />Brief Description of Revision: TR -105 revises the post -mine topography <br />for the South Taylor Pit, West Pit, and East <br />Pit. TR -105 also updates all surface water <br />hydrology releated to the revised PMT. <br />Public Notice Attached: Yes ✓ No _ . (Required for PRs and TRs) <br />Bond Increase: Yes ✓ No _ Federal ?' Non - Federal _ Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed ( + / -) _ _ 0 .0 Acres <br />Permit ( + / -) _ _ k .0 Acres <br />Affected ( + / -) _ _ 0 . 0 Acres <br />Mineral Ownership - <br />Mineral Private ( + / -) _ _ 0 0 Acres <br />Mineral Federal ( + /_) _ _ 0 , 0 Acres <br />Surface Ownership - <br />Private Land ( + / -) _ _ 0 . 0 Acres <br />Federal Land ( + / -) _ _ 0 . 0 Acres <br />State Land ( + /_) _ _ 0 . 0 Acres <br />Mineral State ( + / -) _ _ 0 . 0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.