Laserfiche WebLink
-4- <br />12. Primary future (Post - minims) land use (check one): <br />Cropland(CR) M Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />J � l Developed Water Resources(WR) <br />13. Primary present land use check one : <br />Cropland(CR) Pastureland(PL) — General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) L9 Industrial/Commercial(IC) <br />—� Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dry mining <br />15. On Site Processine: _Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavator/Truck <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Installation of a French drain along the south portion of the north cell of Pit 29 (Parcel A), and along the <br />norhtern portion of the Stagecoach Pit to alleviate ground water mounding at the pinch point between Pit <br />29 and the Stagecoach Pit. The French drain along the south side of Pit 29 will be located inside the <br />present permit boundary as will the construction activities for the initial installation of that drain. A pipeline <br />connecteng the Pit 2-9- fim- nch dra*n 2nd the Stagecoach french draffin Will he 1 inder BrightOA Rd <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />15. On Site Processine: _Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Excavator/Truck <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Installation of a French drain along the south portion of the north cell of Pit 29 (Parcel A), and along the <br />norhtern portion of the Stagecoach Pit to alleviate ground water mounding at the pinch point between Pit <br />29 and the Stagecoach Pit. The French drain along the south side of Pit 29 will be located inside the <br />present permit boundary as will the construction activities for the initial installation of that drain. A pipeline <br />connecteng the Pit 2-9- fim- nch dra*n 2nd the Stagecoach french draffin Will he 1 inder BrightOA Rd <br />