Laserfiche WebLink
TABLE 2. ,En :ineer's_Opinion, of Probable_ Cost <br />Applegate <br />Group, um <br />$rann, n, Sand and' Grave'' <br />Pit '29 Gf OW11dY1/8tei"if0,Vatj0,n <br />--_ Job Name:_ <br />- -- - -- - Biannan Pit.2 <br />,1490 W. 121st Ave., Suite 1'40 <br />(F <br />Job No. <br />10x116 <br />Denver,'CO.80234 <br />_ <br />By:= <br />= - CEVA <br />Phone :(303)452 =6611 <br />'1#iJ�1s,.Cc�ur�Cy,yC�? <br />- Date: _ -- <br />_ _ <br />_- - _ 12/311201'4 <br />Fax: (303) 452-2759 - <br />_ <br />PREL1MIt�lARY r <br />- <br />: = Pr 'ectf <br />_ _ <br />-- = Client = <br />Pk 29 {iW Mit , .- - <br />Brannan Sand &'Grave <br />'SUBTOTAL $ 147,040 <br />10 CDNSIR CI10NPROFIT&RISK(Ift) $ 14,700 <br />11 MOBRZATION (3'/) $ 4,410 <br />12 SURVEYING(STARIN) (1 0%) $ 1,470 <br />13, CALTES WG(1' /) $ 1,470 <br />14, CDNnN(WNCY(10° /u) $ 14,700 <br />,TCITAL $ 1833,750 <br />'Note: <br />1. Ptepated forbad8etaty purposes; totals rounded to the nearest thousand dolim. <br />NIl1 ER OF <br />U41T <br />I= <br />FSTOUT® <br />Di SCRNgWN <br />IIWS <br />TD'E <br />COST <br />COST <br />Construction <br />V Chwand Grob (Inc. Stockpile) <br />0.75 <br />AC <br />$ <br />4,500.00 <br />$ <br />3,375 <br />2 finch DburaterADS HDFEN 12 Perfotated Pipe <br />1,900 <br />IF <br />$ <br />25.00 <br />$ <br />47,500 <br />3 124ach Diameter ADS HDPEN-12 Pipe <br />20 <br />IF <br />$ <br />25.00 <br />$ <br />500 <br />4 r Washed Dram hock <br />1,450 <br />CY <br />$ <br />40.00 <br />$ <br />58,000 <br />5 Mitafi 140N Nonwoven Geoteide <br />4,500 <br />SY <br />$ <br />3.00 <br />$ <br />13,500 <br />6' Trench Emavation <br />1,900 <br />CY <br />$ <br />4.00 <br />$ <br />7,600 <br />7, C Dnipacted Back® (Drain Rock and Native) <br />1,8D0 <br />CY <br />$ <br />3.00 <br />$ <br />5400 <br />8'4- BDiandw Manhole (Ijpiwo <br />3 <br />EA <br />$ <br />3,000.00 <br />$ <br />91000 <br />9 Waterstop Casket (12 inch Diameter) <br />6 <br />EA <br />$ <br />200.00 <br />$ <br />1,20 <br />'SUBTOTAL $ 147,040 <br />10 CDNSIR CI10NPROFIT&RISK(Ift) $ 14,700 <br />11 MOBRZATION (3'/) $ 4,410 <br />12 SURVEYING(STARIN) (1 0%) $ 1,470 <br />13, CALTES WG(1' /) $ 1,470 <br />14, CDNnN(WNCY(10° /u) $ 14,700 <br />,TCITAL $ 1833,750 <br />'Note: <br />1. Ptepated forbad8etaty purposes; totals rounded to the nearest thousand dolim. <br />