Laserfiche WebLink
RECEIVED <br />APR 0 0 2015 <br />DIVISIviti c,L LAMATION, <br />MINING 8 MINERALS <br />F)US PORT MAE MIL <br />112d -1 Annual Report <br />Page 2 of 3 <br />Permittee ame: <br />Wildca inin g Cor gyration <br />Permit Number: <br />M- 1981 -185 <br />Operation Name: <br />May Day Idaho Mine Complex <br />County: <br />La Plata _ <br />Annual Fee Due: <br />$1,150.00 <br />Anniversary Date: <br />September 5, 2014 <br />Permit Acreage: <br />274.70 <br />Current Bond Amt: <br />$204.562.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116. each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates Ibr the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will he reviewed by titre Division upon receipt and prior to the next compliance <br />inspection of the site. 11. while completing this report. you learn that your site is not in compliance with the rules and the <br />act. it is advisable that tite issues be rectified promptly to avoid possible enforcement action. <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />l:S NO <br />2. <br />Is the affected area bcxmdaty clearly marked in accordance with Rule 3.1.12(2). <br />YF'S NO <br />3. <br />is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES iV( <br /><1 <br />(f"YES;' please note time limits related to completion of reclamation, Rule 3.1.3. <br />Seed <br />application <br />method: <br />4. <br />What was the date of last excavation, processing or hauling activity at the mine? <br />not operational <br />5. <br />Does the mine operate more than 180 days per year <br />YES <br />11"'NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status'? <br />YES U <br />h) approval for INTERMITTENT OPERATION? <br />YES NO <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />< 20 acres <br />8. <br />Number of acres that were newly affected during the current report year. <br />0 acres <br />9. <br />Number of acres that were reclaimed during the current report year, <br />less than 1 acre <br />10. <br />Estimated new acreage to be affected in the next report year. <br />less than 1 acre <br />11. <br />Estimated acres to be reclaimed in the next report year. <br />less than 1 acre <br />12 <br />Total acres in various staees of reviamatinn 6ni -P m, rn,;it,..t —; m* :4: t I ...... <br />'Total acres <br />backfifled: <br />YotaI acres <br />graded: <br /><1 <br />Total acres <br />seeded w/ <br />a roved mix: <br />Total acres <br />fertilized/ <br />a vd fertilizer: <br /><1 <br />Total acres <br />w /topsoil <br />reLlaced: <br />Topsoil <br />replacement <br />de nth (in.): <br /><1 <br />NA <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons): <br /><1 <br />1 -2 <br /><1 <br />Seed <br />application <br />method: <br />Broadcast <br />Fertilizer <br />application <br />method: <br />Mulch <br />NSA application <br />method: <br />manual <br />