Laserfiche WebLink
<;f <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />ANGLOGOLD ASHANTI (COLORADO) amec <br />SQUAW GULCH (VLF) WEEKLY REPORT foster <br />wheeler <br />Anaconda Mine complex: One Cat D10 dozer and one JD670 excavator removed shot rock in <br />preparation for geogrid and concrete cap. A Sandvik 800 track drill prepared a production shot <br />pattern in preparation for geogrid installation. Remediation to be continued. <br />11) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />CQA ACTIVITIES: <br />1) Field Activities: <br />Field activities and observation during this reporting period included: Slope grading, structural fill <br />placement, SLF, SSF, and SF sampling, SO placement in the PSSA, underground working <br />remediation, pumping of the LVSCS riser pipes, ADR2 waterline excavation, and subgrade <br />preparation of the A bench. <br />II) Laboratory Activities: <br />Atterberg limits, moisture, laboratory compaction, and sieve analysis laboratory testing continued. <br />The following samples were collected and returned to Amec Foster Wheeler's laboratory for analysis: <br />Soil Liner Fill: SLF- 176 -C, 1SLF -4 -R, Select Structural Fill: SSF -14 -R <br />General Proiect Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held March 25, 2015 (Amec Foster Wheeler, CC &V, Ames) <br />Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling were some of the tasks occurring between CC &V <br />Projects, Amec Foster Wheeler, and Ames. <br />Deliveries: None. <br />Submitted by: Mike Moore Date: April 1, 2015 <br />Reviewed by: <br />CC &V Projects <br />Reviewed By: <br />Reviewed By. S Lr- <br />Date: <br />Date: A/1.5 <br />Date: '9 - / -15- <br />