Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Cost Summar <br />Site: Peabody Sage Creek Mine Permit Action: RN1 -2015 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 4/1/2015 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Page 1 of 138 <br />Permit/Job #: C2009087 <br />Abbreviation: None <br />Filename: C087 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />010 <br />011 <br />012 <br />013 <br />020 <br />021 <br />022 <br />023 <br />024 <br />030 <br />031 <br />032 <br />033 <br />034 <br />035 <br />040 <br />041 <br />042 <br />045 <br />046 <br />047 <br />050 <br />051 <br />052 <br />053 <br />054 <br />060 <br />061 <br />Haul Backfill Material from Coal Handling <br />Facilities to Port <br />TRUCKI <br />2 <br />3 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />243.07 <br />$380,952.00 <br />$216,904.00 <br />$348,195.00 <br />$112,102.00 <br />$10,018.00 <br />$1,493.00 <br />$1,732.00 <br />$433.00 <br />$7,039.00 <br />$16,243.00 <br />$4,331.00 <br />$812.00 <br />$698.00 <br />$1,185.00 <br />$2,734.00 <br />$729.00 <br />$137.00 <br />$120.00 <br />$1,367.00 <br />$3,236.00 <br />$2,187.00 <br />$957.00 <br />$24,067.00 <br />$16,271.00 <br />$7,253.00 <br />$3,670.00 <br />$2,622.00 <br />$145.00 <br />$24.00 <br />$11.00 <br />$35,745.00 <br />$54,896.00 <br />Haul Backfill Material from Utility Pad Area to <br />Portal Face - <br />TRUCKI <br />102.12 <br />Haul Backfill Material from South Facilities to <br />Portal Face - <br />TRUCKI <br />182.31 <br />Remove Coal Stockpile Footprint <br />TRUCKI <br />63.46 <br />Regrade Cut Material Over 6.93 ROM Coal Area <br />DOZER <br />46.54 <br />Regrade Cut Material Over covered Storage Pad <br />Area <br />DOZER <br />6.94 <br />Regrade Drill Pads COV11, CCU31, CCU47, <br />CCU58, CCU67, CCU84, <br />DOZER <br />7.78 <br />Regrade Drill Pads CCU087 and Septic Drainfield <br />DOZER <br />1.94 <br />Remove Gravel from North Facilities Parking Area <br />TRUCKI <br />4.99 <br />Remove Gravel from Main North Facilities Area <br />TRUCKI <br />11.51 <br />Remove Gravel from North Facilities Electrical <br />Shop Area <br />TRUCKI <br />3.07 <br />Remove Gravel from North Office Parking Area <br />TRUCKI <br />0.58 <br />Remove Gravel from South Powder Magazine Pad <br />TRUCKI <br />0.49 <br />Rip North Facilities Parking Area <br />RIPPER <br />3.24 <br />Rip North Facilities Area <br />RIPPER <br />7.48 <br />Rip North Electrical Shop Facilities Area <br />RIPPER <br />1.99 <br />Rip North Office Parking Area <br />RIPPER <br />0.37 <br />Rip South Powder Magazine Pad <br />RIPPER <br />0.32 <br />Rip South Covered Storage Area <br />RIPPER <br />3.74 <br />Rip Haulroad A /A1 Reduction <br />RIPPER <br />8.85 <br />Rip Haulroad B Reduction <br />RIPPER <br />5.98 <br />Rip Haulroad D <br />RIPPER <br />2.61 <br />Regrade Haulroad A/A1 Reduction <br />DOZER <br />32.94 <br />Regrade Haulroad B Reduction <br />DOZER <br />22.27 <br />Regrade Haulroad D <br />DOZER <br />9.93 <br />Regrade Upper Sump <br />DOZER <br />10.36 <br />Regrade Lower Sump <br />DOZER <br />7.40 <br />Regrade Area Ditches <br />GRADER <br />1.03 <br />Backfill and Regrade Microwave Tower Pad <br />(MR22) <br />DOZER <br />0.16 <br />Replace Topsoil on Microwave Tower Pad <br />DOZER <br />0.08 <br />Replace Topsoil on Coal Handling Facilities Area <br />SCRAPERI <br />30.32 <br />Replace Topsoil on Portal Face -Up Area <br />SCRAPERI <br />46.56 <br />CIRCES Cost Estimating Software <br />