My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-03_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2015-04-03_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:02 PM
Creation date
4/3/2015 12:37:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
4/3/2015
Doc Name
Adequacy Review No. 1
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN1
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip North Facilities Area <br />Site: Peabody Sage Creek Mine Permit Action: RN1 -2015 <br />PROJECT IDENTIFICATION <br />Task #: 031 State: Colorado <br />Date: 3/30/2015 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - lOSU <br />Ripper Attachment: 3 -Shank Ripper <br />Page 40 of 138 <br />Permit/Job #: C2009087 <br />Abbreviation: None <br />Filename: C087 -031 <br />Horsepower: 574 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />NA <br />feet /second <br />Area: <br />Utilization % <br />Ownership Cost /Hour: <br />$131.86 <br />Average Ripping Width: <br />NA <br />Operating Cost/flour: <br />$184.48 <br />250.00 <br />100 <br />Ripper Operating Cost/flour: <br />$11.02 <br />feet <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />Production per unit area: <br />NA <br />Total Unit Cost/flour: <br />$365.36 <br />Total Fleet Cost/Hour: <br />$365.36 <br />0.966 <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods <br />Seismic: NA Bank Volume: <br />Area: 6.00 acres Rip Depth (ft): <br />Source of estimated quantity: Map <br />HOURLY PRODUCTION <br />NA <br />1.50 <br />2.05.3 M1B <br />BCY NA <br />Volume: 14,520 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet /second <br />Area: <br />Average Ripping Depth: <br />1.50 <br />mph <br />Average Ripping Width: <br />8.67 <br />degrees <br />Average Ripping Length: <br />250.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.966 <br />acres /hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.966 <br />Acres/hr <br />Site Altitude: <br />6,800 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift /day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.80 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.80 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />7.48 <br />Hours <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.