Laserfiche WebLink
Page 25 of 138 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />10560.00 <br />0.00 <br />1.20 <br />1.20 <br />4223 <br />3.212 <br />Haul Time: 3.212 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />10560.00 <br />0.00 <br />1.20 <br />1.20 <br />4254 <br />2.754 <br />Return Time: <br />Total Truck Cycle Time: <br />2.754 <br />8.616 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 1,104.00 LCY/Hour Adjusted for job efficiency: 91632 LCY/Hour <br />Truck Unit Production <br />211.42 LCY/Hour Adjusted for job efficiency: 175.48 LCY/Hour <br />Optimal No. of Trucks: 5 Truck(s) Selected Number of Trucks: 6 Truck(s) <br />Adjusted hourly truck team production: 1,052.87 LCY/Hour <br />Adjusted single truck/loader team production: 916.32 LCY/Hour <br />Adjusted multiple truck/loader team production: 916.32 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.539 /LCY <br />Total job time: 4.99 Hours <br />Total job cost: $7,039 <br />CIRCES Cost Estimating Software <br />