My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-03_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2015-04-03_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:02 PM
Creation date
4/3/2015 12:37:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
4/3/2015
Doc Name
Adequacy Review No. 1
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN1
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4755 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />405.41 LCY /hr <br />405.41 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.531 /LCY <br />Total job time: <br />Total job cost: <br />46.54 Hours <br />$10,018 <br />Page 16 of 138 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.