Laserfiche WebLink
Page 11 of 138 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />Time <br />min <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />4.00 <br />3891 <br />0.703 <br />min <br />1 <br />1250.00 <br />-1.00 <br />3.00 <br />2.00 <br />3843 <br />1.131 <br />Haul Time: 1.131 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />1250.00 <br />1.00 <br />3.00 <br />4.00 <br />3891 <br />0.703 <br />CIRCES Cost Estimating Software <br />Return Time: 0.703 <br />minutes <br />Total Truck Cycle Time: 5.079 <br />minutes <br />Loading Tool unit <br />Production <br />811.40 <br />LCY/Hour Adjusted for job efficiency: <br />673.46 LCY/Hour <br />Truck Unit Production <br />358.65 <br />LCY/Hour Adjusted for job efficiency: <br />297.68 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 595.36 <br />LCY/Hour <br />Adjusted single truck/loader team production: 59536 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,190.73 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />2 <br />Team(s) Total job time: 182.31 <br />Hours <br />Unit cost: <br />$1.604 <br />/LCY Total job cost: $348,195 <br />CIRCES Cost Estimating Software <br />