Laserfiche WebLink
Page 8 of 138 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />Time <br />min <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />3.00 <br />4074 <br />0.466 <br />min <br />1 <br />500.00 <br />0.00 <br />3.00 <br />3.00 <br />2754 <br />0.632 <br />Haul Time: 0.632 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Loading Tool unit <br />1 <br />500.00 <br />0.00 <br />3.00 <br />3.00 <br />4074 <br />0.466 <br />CIRCES Cost Estimating Software <br />Return Time: 0.466 <br />minutes <br />Total Truck Cycle Time: 4.343 <br />minutes <br />Loading Tool unit <br />Production <br />811.40 <br />LCY/Hour Adjusted for job efficiency: <br />673.46 LCY/Hour <br />Truck Unit Production <br />419.43 <br />LCY/Hour Adjusted for job efficiency: <br />348.13 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 696.26 <br />LCY/Hour <br />Adjusted single truck/loader team production: 673.46 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 2,020.39 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />3 <br />Team(s) Total job time: 102.12 <br />Hours <br />Unit cost: <br />$1.051 <br />/LCY Total job cost: $216,904 <br />CIRCES Cost Estimating Software <br />