My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-03_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2015-04-03_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:59:02 PM
Creation date
4/3/2015 12:37:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
4/3/2015
Doc Name
Adequacy Review No. 1
From
DRMS
To
Peabody Sage Creek Mining, LLC
Type & Sequence
RN1
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 138 <br />Truck Bed (volume) Basis: <br />Truck <br />Loader <br />Struck Volume: <br />21.60 <br />LCY <br />Heaped Volume: <br />31.70 <br />LCY <br />Average Volume: <br />26.65 <br />LCY <br />Adjusted Volume: <br />30.94 <br />LCY <br />Final <br />Truck Volume <br />Based on Number of Loader Passes: 30.36 LCY <br />Loading Tool Capacity <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Bucket Size Class: NA <br />Rated Capacity: 9.200 LCY (heaped) <br />Bucket Fill Factor: 0.825 Blasted rock - avg. blasted (75 - 90 %) 0.825 <br />Adjusted Capacity: 7.590 LCY <br />Job Condition Corrections: Site Altitude (ft.): 6800 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br />4 passes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.575 minutes <br />4 passes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up 0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.60 <br />Truck Load Time: 1.645 <br />Truck Maneuver and Dump Time: 1.00 <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.060 minutes <br />0.515 minutes <br />1.645 minutes <br />Minutes Adjusted for site altitude: 0.600 Minutes <br />Minutes Adjusted for site altitude: 1.645 Minutes <br />Minutes Adjusted for site altitude: 1.000 Minutes <br />Road Condition: Firm, smooth, rolling, dirt /lt. surfaced, watered, <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.