My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-02_GENERAL DOCUMENTS - C1981028
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2015-04-02_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:58 PM
Creation date
4/3/2015 10:02:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
4/2/2015
Doc Name
Proposed Decision and Findings (SL7)
From
DRMS
To
Coors Energy Company
Permit Index Doc Type
Findings
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
areas, should those areas fail (Rule 3.03.1(3)(a) and 3.01.3(3)(d)). Below is a table summarizing how <br />the Division estimated the amount of liability that is eligible to be released for the SL7 bond release <br />parcels: <br />Table 1: Keenesburg Strip Mine; SL7, Releasable Liability Amount Summary Table <br />Task <br />Description <br />Hours <br />Cost <br />A02 <br />Backfill B -Pit Parcels; 30, 31 and 32 <br />147.58 <br />$321,794.07 <br />E01 <br />Topsoil Parcels 30, 31 and 32 <br />55.29 <br />$120,868.00 <br />FO1 <br />Seed 27.1 acres (Parcel 30, 31, 32) <br />27.1 <br />$17,123.95 <br />Total Direct Cost <br />Total <br />229.97 <br />$459,786.02 <br />Overhead and Profit <br />Liability Insurance 2.02% of Direct Cost <br />2.02% <br />$9,287.68 <br />Performance Bond 1.05% of Direct Cost <br />1.05% <br />$4,827.75 <br />Job Superintendent cost/hour time 50% of total task <br />hours; $65.41/hr <br />115 <br />$7,521.17 <br />Profit 10% of Direct Cost <br />10% <br />$45,978.60 <br />TOTAL <br />$67,615.20 <br />Legal - Engineering - Project Management <br />Engineering work and /or contract/bid prep; 4.25% of <br />Contract <br />4.25% <br />$22,414.55 <br />Reclamation Management and /or Administration; <br />4.00% of Contract <br />4.00% <br />$21,096.05 <br />TOTAL $43,510.60 <br />SL7 Parcels, Total Applicable Bond Amount <br />$570,911.82 <br />60% of Applicable Bond <br />$342,547.09 <br />SL7 Bond Release Request Amount <br />$321,794.00 <br />MT6 Liability Total $1,971,874.00 <br />SL7 Reduction Amount $342,547.09 <br />New Liability Amount $1,629,326.91 <br />The last substantial reclamation cost estimate conducted for the Keenesburg Strip Mine was during the <br />2014 Midterm Review (MT6). The total applicable bond amount held specifically for the 27.1 -acre SL7 <br />bond release parcels was determined based on the MT6 cost estimate. The total applicable bond amount <br />is the total cost of backfilling, grading topsoiling and seeding the reclamation parcels. For a Phase I <br />bond release, in accordance with Rule 3.03.1(3)(b), no more than 60% of the applicable bond amount <br />can be released. The Division calculated that 60% of the applicable bond for the SL -7 bond release <br />parcels is $342,547.09. <br />Page 7 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.